Welcome to Moore Automation Limited

0
Loadding...
 

sales@mvme.cn    Phone: +86 18030175807

Home>AB>Allen-Bradley 1772-LP3 PLC-2/30 Processor
Allen-Bradley 1772-LP3 PLC-2/30 Processor

Allen-Bradley 1772-LP3 PLC-2/30 Processor Item NO.: 2909168

Write a Review
US$ 1.00
Quantity
Stock ( 28 )

Copy and share this link on social network or send it to your friends

Copy
Request Price & AvailabilitySend the part number and quantity. Our team will confirm stock, condition, lead time and the best quotation.
  • MOQ: 1 piece
  • International shipping
  • 1-year warranty on eligible items
  • Fast response during business hours
Product Name Allen-Bradley 1772-LP3 PLC-2/30 Processor
Item NO. 2909168
Weight 0.1 kg = 0.2205 lb = 3.5274 oz
Category AB
Brand ALLEN-BRADLEY
Creation Time 2026-09-17

Allen-Bradley 1772-LP3 PLC-2/30 Processor
CATALOG1772LP3

Allen-Bradley · PLC-2/30

Allen-Bradley 1772-LP3 PLC-2/30 Processor

Processor for PLC-2/30 control execution and Data Highway communication through a 1771-KA2 adapter.

Product identity and system role

Product Overview

Within the PLC-2 family, the 1772-LP3 is the PLC-2/30 Processor used to execute a user program while coordinating the controller scan.

Plant-level data exchange is available when 1772-LP3 is linked to a 1771-KA2 Communication Adapter Module, which supplies the processor-side and Data Highway interfaces.

A replacement decision for 1772-LP3 must retain the complete catalog because PLC-2/20 processors 1772-LP1 and 1772-LP2 and the separate 1772-LR processor have different identities and link requirements.

Concise verified values

Technical Data

Technical Item 1772-LP3
Brand Allen-Bradley
Product Type PLC-2/30 Processor
Brand Country United States
Controller Family PLC-2
Communication Adapter 1771-KA2
Processor Link Rate 91.2 kbaud
Recommended Data Highway Rate 57.6 kbaud
Maximum Network Stations 64
Maximum Network Distance 10,000 ft (3,048 m)
PLC-2/30 control path

Remote I/O Integration

Functional focus

Processor role

The processor executes the user program and maintains the normal input/output scan for its installed PLC-2/30 station.

System relationship

I/O relationship

Field states remain part of the PLC scan rather than being transferred to the network adapter as a control task.

Maintenance check

Maintenance check

Verify the PLC-2/30 catalog and installed chassis relationship before moving program or I/O responsibilities.

91.2 kbaud processor link

Data Highway Communication

Keep the paths separate.The processor connects to the 1771-KA2 at 91.2 kbaud, while the shared Data Highway is normally operated at 57.6 kbaud.

For 1772-LP3, data highway communication must be reviewed with the installed controller hardware and saved application rather than treated as an isolated catalog-number change.

  • Use the 1771-KA2 as the station interface.
  • Retain the complete 1772-LP3 identity during setup.
  • Check the 64-station and 10,000 ft network limits.
Selection, replacement and commissioning

Practical Questions

Can 1772-LP3 connect directly to a Data Highway trunk?

Install a 1771-KA2 Communication Adapter Module between the processor and the network. The adapter provides the two communication channels required for the PLC-2/30 station.

Why should the 1772-LP3 processor link not be set to 9.6 kbaud?

The documented processor-side rate for this supported PLC-2/30 processor is 91.2 kbaud. The 9.6 kbaud exception applies to 1772-LR, not 1772-LP3.

What network size can include a 1772-LP3 station?

A Data Highway cable can include up to 64 controller or computer stations. The total cable distance must remain within 10,000 ft (3,048 m).

Does a 1771-KA2 replace the control scan of 1772-LP3?

No; the processor continues scanning I/O and executing its user program. The adapter handles access to the shared communication cable.

How can a buyer avoid confusing 1772-LP3 with 1772-LP1 or 1772-LP2?

Use the full catalog from the installed processor and identify it as PLC-2/30. The related LP1 and LP2 catalogs belong to PLC-2/20 and should not be quoted from the shared prefix alone.

What should be checked before adding 1772-LP3 to an existing plant network?

Confirm the 1771-KA2 interface, processor-side rate, Data Highway rate and remaining station count. Cable routing and total network distance should also be verified before commissioning.

Moore Automation

Lifecycle Parts Support

Moore Automation

Keep legacy control assets serviceable

Moore Automation helps maintenance teams source current, discontinued and hard-to-find automation parts. Complete catalog numbers are checked before quotation so close PLC-2 and PLC-3 variants stay separated.

Urgent enquiries, planned spares and replacement projects are handled through one assigned contact from model review to shipment follow-up.

Catalog-number reviewVariant details kept visible.
Legacy coverageOlder control families included.
Responsive contactOnline enquiries within 12 hours.
Shipment follow-upTracking after dispatch.

No related record found

Copyright © 2004–2026 www.mvme.cn. All rights reserved.

Disclaimer: Moore Automation Limited is an independent reseller and is not an authorized distributor or representative of the manufacturers featured on this website. Product names and trademarks belong to their respective owners.