GE IC695PSD180 PACSystems RX3i 80 W DC Power Supply
Product Description
IC695PSD180 is an 80 W DC power supply for an RX3i universal backplane. It accepts a nominal 24 VDC source and supports load sharing or redundant arrangements where the rack power design requires it.
This supply feeds the RX3i backplane rather than field loads. Calculate rack demand, identify any load-sharing partner and record alarm behavior before removal; after wiring, verify polarity, status indicators and sharing under controlled load.
Technical Specifications
Rack Power Budget and Redundancy
Load total
Add CPU, communication and I/O demand before selecting the operating margin.
Pair behavior
A redundant arrangement needs both supplies, source wiring and fault response verified as a system.
Heat state
Overtemperature or overload indication is a cabinet problem to investigate, not only a supply fault.
De-Energized Replacement
Record
Record the rack load, redundant feed arrangement and alarm wiring.
Isolate
Isolate and prove the DC source dead before moving field conductors.
Torque
Torque wiring, energize with outputs controlled, and verify sharing plus removal of either supply.
FAQ
Which order-code checks belong to the Rack Power Budget and Redundancy decision for IC695PSD180?
Match the complete order code, hardware revision, temperature and installed system configuration; a similar family name is not enough for replacement selection.
What must be backed up before the De-Energized Replacement procedure for IC695PSD180?
Save the editable application, hardware configuration, communication parameters, retained production data and the firmware or software baseline used by this PACSystems RX3i 80 W DC Power Supply.
How does load total affect Rack Power Budget and Redundancy for IC695PSD180?
Add CPU, communication and I/O demand before selecting the operating margin.
Why does pair behavior need separate verification during De-Energized Replacement for IC695PSD180?
A redundant arrangement needs both supplies, source wiring and fault response verified as a system.
How should IC695PSD180 complete the De-Energized Replacement sequence before return to service?
Complete the documented startup sequence, verify diagnostics and communications, test the application under controlled conditions and confirm the applicable machine interlocks.
Moore Automation coordinates international industrial-parts orders and supports customer-selected shipping arrangements.
Order handling can include destination details, preferred transport method and the documents needed for dispatch.