Charge path
While the controller is powered, the CPU maintains the energy stored in IC695ACC402-AB.
Welcome to Moore Automation Limited
Copy and share this link on social network or send it to your friends
Copy| Product Name | GE Fanuc IC695ACC402-AB CPU Energy Pack |
| Item NO. | 2945586 |
| Weight | 0.1 kg = 0.2205 lb = 3.5274 oz |
| Category | GE |
| Brand | GE |
| Creation Time | 2026-11-27 |
GE Fanuc IC695ACC402-AB is a PACSystems RX3i CPU Energy Pack used with supported controller hardware. When system power is lost, the pack supplies the connected CPU long enough for user memory to be written from volatile memory into non-volatile storage.
The IC695ACC402-AB cable connects the pack directly to the CPU energy-pack port. During normal operation the CPU supervises the pack and charges it; during a power interruption, the stored energy follows that same dedicated connection rather than feeding the entire backplane.
Status handling for IC695ACC402-AB is tied to charge condition, connection and service life. A newly connected or replaced pack must reach its operating charge before the memory-retention path can be treated as available.
The pack is not a general rack supply; its electrical path terminates at the supported CPU.
While the controller is powered, the CPU maintains the energy stored in IC695ACC402-AB.
The energy-pack cable carries charge and status between the pack and the CPU port.
The controller distinguishes disconnected, charging, ready and service conditions.
The pack mounts beside the CPU so the short dedicated cable is not routed through field wiring.
Charge energy, supervision data and the power-loss response all use the dedicated CPU connection. Keeping this path separate from rack and field wiring explains why cable condition and the controller ready state are part of the memory-retention function.
Memory preservation depends on the sequence from normal charging to controlled discharge at power loss.
The controller operates from the rack supply while the energy pack remains charged.
The pack immediately maintains the CPU long enough to start the memory-save sequence.
User memory is written into non-volatile storage before pack energy falls below the operating boundary.
After power returns, the pack recharges and its status must be confirmed before the next interruption.
The pack is useful only when this entire sequence is completed: charge, ready confirmation, controlled discharge and recharge. Testing an unready pack or disconnecting its lead breaks the sequence even when the controller operates normally from rack power.
A newly installed pack has not yet accumulated the energy required for the complete memory-save interval. Wait for the controller to report the ready condition before interrupting power.
Record the exact AB label, cable identity, CPU model, status indication before removal and the charge state after installation.
No. Its controlled energy path serves the supported CPU memory-save function; it is not a substitute for the rack power supply.
Inspect both connectors and the dedicated cable, reseat only with the documented power state, then compare the controller status before replacing the pack.
The available hold-up time can be insufficient for the CPU to complete memory storage. Restore power, correct the connection and wait for the ready indication before another test.
The specified location protects the dedicated lead from strain and keeps it outside field-power and signal wiring routes.
Moore Automation keeps energy-pack, CPU and cable identities on one enquiry record without treating nearby revisions as interchangeable.
Requested documents, quotation information and delivery communication are coordinated by one named contact.
Moore Automation Sales Team
Copyright © 2004–2026 www.mvme.cn. All rights reserved.
Disclaimer: Moore Automation Limited is an independent reseller and is not an authorized distributor or representative of the manufacturers featured on this website. Product names and trademarks belong to their respective owners.
No related record found