Moore Automation will observe the China National Day holiday from October 1 through October 7, 2026. Normal quotation follow-up, order processing and warehouse coordination will resume on October 8.
Customers preparing plant maintenance, a planned shutdown or an urgent replacement purchase can send requirements before the break. Messages received during the holiday will remain available for review when the sales team returns.
Industrial automation parts are often separated by a voltage class, communication interface, safety option, hardware revision or connector arrangement that appears only in the complete catalog number. A family name such as a PLC series, drive range or proximity system is usually not enough to identify the installed configuration.
For time-sensitive requirements, combine the purchasing and technical information in one message. This gives the sales team a clear record to review after the holiday and reduces extra clarification when normal service resumes.
Email the model numbers, quantity, destination and supporting photos.
Your message remains available with the details supplied during the holiday.
Catalog-number checks, quotation work and shipping coordination resume after the break.
A holiday shutdown changes staffing and response time as well as production. Before the last operating shift, maintenance teams can preserve the information needed to compare the plant before and after the stop. These checks do not replace the site's approved operating, electrical-safety or restart procedures.
Save the active PLC, DCS and HMI projects, and record drive, servo or intelligent-instrument parameters that are not stored in the main controller project.
Record active alarms, drive faults, communication diagnostics and relevant machinery-monitoring readings so the restart team has a baseline.
Match each spare to its installed location and retain the complete manufacturer code, option suffix, available quantity and storage location.
Define who authorizes energization and the order in which utilities, control power, networks, safety functions and production equipment return to service.
Customers can review product categories and purchasing information before sending a request. Internal links help the news page connect readers with the next practical action without repeating material already available elsewhere on the site.
Yes. Enquiries can be sent by email or WhatsApp during October 1–7. Normal review and follow-up resume on October 8, 2026.
Send the brand, complete catalog number, quantity, destination, required date and any relevant series or revision. Include a clear nameplate photo when the installed label is difficult to read.
No automatic holiday dispatch should be assumed. Warehouse availability, carrier operation and the destination route must be confirmed for the individual order.
Controllers, I/O modules, drives, servo hardware, industrial network devices and machinery-monitoring components commonly use suffixes or option fields that change electrical or mechanical compatibility.
Provide the complete model numbers and purchasing requirements so the team can review the requested configurations when normal service resumes.
Moore Automation Sales Team